OEM 3-10 tons PTO driven hydraulic agricultural dump trailer, capacity 210*160*30cm, with core tire assembly
Product Details:
Place of Origin: | China |
Brand Name: | Greenguards |
Certification: | ISO9001:2015 |
Model Number: | 4T-2C-2100 |
Payment & Shipping Terms:
Minimum Order Quantity: | 1 |
---|---|
Price: | Negotiate |
Packaging Details: | export packing |
Delivery Time: | 1-7days |
Payment Terms: | L/C, D/A, D/P, T/T, Western Union, m |
Supply Ability: | 100 |
Detail Information |
|||
Product Name: | PTO Driven Hydraulic Agricultural Dump Trailer | Size: | 2300*1700*1290mm |
---|---|---|---|
Weight: | 600kg | OEM: | Support |
Packing: | Wooden Box |
Product Description
OEM 3-10 tons PTO driven hydraulic agricultural dump trailer, capacity 210*160*30cm, with core tire assembly
Feature highlights:
The 4T-2C-2100 dump trailer features a heavy-duty frame and drawbar.
It is equipped with turf tires, adjustable hooks, non-slip steel plates andpowder-coated steel structure.
lt is durable and ideal for transportingbulk cargo on various terrains.
lt has a strong structure, high loadcapacity, easy operation, and is equipped with dual hydraulic cylindersfor rear dumping.
lt is suitable for aqricultural material transportation invarious models from single axle to double axle.
More Products
Lawn Debris Blower Kohler Gasoline Engine , Grass Leaf Blower
OEM Golf Course Twin Turbines Debris Blower , Grass Leaf Blower,3600r Min 4 Stroke Driving Gasoline
……
FAQ
Q1: What is your method of sample Transportation?
A1: We deliver goods via International Express like FedEx, UPS, DHL, TNT, EMS etc.
Q2: Could you please make OEM for us?
A2: Surely yes.We provide the service of replacing your logo and company name on box.
Q3: What's your Payment method supported?
A3: We accept T/T, L/C, etc.
Q4: How does your factory do regarding Quality Control?
A4: Quality is very important and always be put at the first place. We insist one worker charge 1 process.
Having our own Aluminum Die-casting Workshop and Plastic Injection Molding Workshop allow us more easy to control the
quality.Inspections of each step will be done during the production process.