Golf Cart Electric Golf Cart Parts Steering Shaft Bearing G1014213 Fits Club Car 1987-Up
Product Details:
Place of Origin: | China |
Brand Name: | Greenguards |
Certification: | ISO9001:2015 |
Model Number: | 1014213 |
Payment & Shipping Terms:
Minimum Order Quantity: | 5 |
---|---|
Price: | Negotiable |
Packaging Details: | Coated with anticorrosive oil, packed in carton box |
Delivery Time: | 1-7 |
Payment Terms: | L/C, D/A, D/P, T/T, Western Union, m |
Supply Ability: | 200 |
Detail Information |
|||
Product Name: | Golf Cart Steering Bearing | Part Number: | G1014213 |
---|---|---|---|
Type: | Fits Club Car 1987-up | Color: | Metal |
Material: | Steel | Place Of Origin: | Guangdong, China |
Product Description
Golf cart Steering Bearing Electric Golf Cart Parts G1014213 Fits Club Car 1987-up
Description
Item Name | Golf cart Steering Bearingv |
OEM NO. | G1014213 |
Fits on | Club Car 1987-up |
MOQ | 50 PCS |
Quality | OEM standard or as your requirement |
Payment Terms | T/T, Western Union |
Delivery Time |
1. Sample: within 2 days after received sample cost 2. Mass: 10-30 days after received deposit |
Package | 1. Standard export neutral packing 2. Standard export brand packing |
Loading Port | Shenzhen/Guangzhou or customer pointed port |
Steering bearing
- Fits Club Car 1987-up
- Replaces OEM Number(s): 1014213
Feature
G1014213
*【Easy to disassemble】
1. Brand new, OEM quality.
2. Fits on Club Car 1987-up
3. OEM part no#: 1014213.
4. High quality,durable,long lasting.
Our Service
1. OEM Manufacturing welcome: Product, Package...
2. Develop all parts if you can supply us the drawing or samples.
3. We support sample order with Small QTY.
4. We will reply you for your inquiry in 24 hours.
5. After delivery, we will track the products for you once every two days, until you get the products. When you got the goods, test them, and give me a feedback.If you have any questions about the problem, contact with us, we will offer the solve way for you.
Delivery
1. By Road
2. By Air ( for samples or small quantity goods)
3. By Sea ( FCL or LCL )
4. Mainly Ports: GuangZhou Port and ShenZhen Port
FAQ
Q1. What is the delivery date?
A: It takes 5~7 days if there is stock, but takes 30-50 days if there is no stock.
Q2. What is the payment terms?
A: Our payment terms: By T/T 30% deposit before production,70% balance before shipment.
Q3.How is the quality?
A: Strict control when production.
Q4.What is the guanrantee?
A: It can run at least for 30,000 km or 1 year.
Q5.Can you offer free samples?
A: It depends on the sample costs, but we do not pay freight costs.